Building the Summit Tunnels
Building the railroad through the Sierra Nevada was the most challenging aspect of the Transcontinental Railroad. Chinese laborers had to initially bore through rock using 8-pound sledgehammers and chisels, often by candlelight or lantern, to create 2-feet deep by 2.5 inch wide holes, which took hours for a 3-man crew to create. The Chinese laborers first filled 1/3 of the hole with blasting powder, and then clay/hay/sand to secure the fuse. They lit the fuse, ran, and the subsequent explosion sent rock debris, dust, and black powder residue into the air, which made breathing difficult.
Aside from the dangerous blasting, many more Chinese men lost their lives during the harsh winters. During the winter of 1866-1867, there were 44 storms, many of which dumped over 6 feet of snow. Avalanches frequently swept groups of Chinese workers to their deaths. Chinese laborers had to resort to working and traveling through the snow in excavated snow rooms and snow tunnels connecting where they worked to where they lived in their bitterly cold one- and two-story wooden buildings.
Summit Camp, where those structures were located, remains one of the longest-standing camps from the railroad construction era. Despite the harsh working conditions, Chinese laborers were not treated equally to their fellow white workers. On June 25th, around 5,000 Chinese went on a strike against the Central Pacific Railroad. The strike took place along the eastern slope of the Sierras between Cisco and Strong’s Canyon, which is near nowaday Eder. Chinese laborers fought for their rights including a pay increase, reduced workdays, and shorter shifts drilling in life threatening tunnels.
In retaliation, the director of Central Pacific Railroad Charles Croker cut off food and supply trains, even threatening violence against those workers. After eight days, the workers ultimately ended their strike without any of their demands being met. Later evidence, however, suggests that they did receive a pay raise several months later. After beginning work in the Sierras in the fall of 1865, Chinese laborers laid the tracks through the most difficult of the 1,687-feet Summit Tunnel #6 on November 30, 1867. Eventually, they built 37 miles of snow sheds through the Sierra Nevada by 1869. As snow removal techniques improved, many of the older wooden snow sheds grew unnecessary, and were later removed. Those that were still needed were eventually replaced by concrete snow sheds, which remain on site today.
The miners who discovered gold in this area wanted to keep the location a secret, and thus founded Secret Town. At the time, the Transcontinental Railroad ran near Secret Town as an impressive wooden trestle that stretched 1,110 feet across and 95 feet above a nearby ravine. The wooden trestles, however, often caught fire from smokestack sparks as trains crossed. To solve this dilemma, the Central Pacific Railroad hired Chinese laborers to fill the Secret Town trestle with dirt.
Chinese laborers moved large volumes of dirt from the surrounding landscape with hand and mule carts to the trestle. The subsequent filling of Secret Town ravine to accommodate I-80 and other features have largely minimized the scale of the Chinese laborers’ accomplishments. Today, the trestle remains buried under the fill.